Definition of terms
Term | Description/explanation |
---|---|
ACS | Axis coordinate system |
Down channel | Main channel that starts the erosion process and defines the machining mode. |
Escape channel | Auxiliary channel that executes the electrode escape motion using a defined escape strategy. |
Flushing | Long-term or fast electrode escape motion initiated by the PLC to flush the spark gap. |
HLI | The High Level Interface (HLI) is an interface between the PLC and the CNC. |
MCS | Machine coordinate system: First 3-dimensional Cartesian coordinate system. |
Orbit channel | Auxiliary channel where the electrode orbit motion is programmed in the XY plane. |
Orbit geometry | Geometry of the workpiece in the XY plane superimposed on the YZ plane during expansion. |
Orbit disc | An orbit disc results when the down channel is stopped at a specific height (e.g. by inserting a stop label) and the orbit channel continues to move on its geometry. |
PCS | The programming coordinate system is a Cartesian coordinate system which specifies positions in the NC program. |
RZ plane | Plane consisting of radius and Z axis |
TCP | Tool centre point |
GEP | Geometry for erosion on the path |
EDM | Electrical discharge machining |